HB/HO Muon Scan runs summary (2003)

Set #1 - map

Muon scan of HO at energy 225 GeV to Ring 0 and 1. (2003-08-07, eam-HB-HO-ECAL-nospigot9)

Ring 0Ring 1Ring 2
φ/η123456789101112131415
7
6690469026857685868676868688068816930
5690869016856685968666869687868846925
4690969006899686068646870692368856924
36911 69136919 69206895686168636871687468866932
26915 691769186892692168626872687368916933

Set 2 - map

Muon scan of HO at 225 GeV for Ring 2. (2003-08-12, eam-HB-HO-ECAL nospigot 9,10)

Ring 0Ring 1Ring 2
φ/η123456789101112131415
7
6 7642 7644 7647 7648 7649
576547653 7652 7651 7650
4 76557657 7658 7659 7660
3 7665 7664 7663 7662 7661
2 7666 7667 7668 7669 7670

Set 3 - map

225 GeV Muon for Ring 1 and 2 (redone to reconfirm mising channels in Ring 2 upper tray). (2003-08-16, Trigger counter is 4x4 setup, run type is beam-HB-HO-ECAL-slink4)

Ring 0Ring 1Ring 2
φ/η123456789101112131415
7
6795179507949
57953
4
3
2

Set 4 - map

225 GeV muon scan of HO (2003-08-18)

Done to resolve the problem of missing channels in Ring 2 upper trays. In order to re-confirm the swapping of fiber (going from QIF to orange cable) R+1 down tray (Tray +, 2, 3) optical cables were swapped with R+2 up trays (Tray 4, 5, 6).

Ring 0Ring 1Ring 2
φ/η123456789101112131415
7
6817281678168816981708171
5817381668165816481638162
48174
38152815381548155815681578158815981608161
2

Set #5

Muon run at 225 GeV for HO (2003-08-19, 10k events)

Done after re-connected the cables to their original positions for Ring 1 lower and Ring 2 upper trays.

Ring 0Ring 1Ring 2
φ/η123456789101112131415
7
682018200819981988197
581928193819481958196
481908189818881878186
3820281818182818381848185
2820381808179817881778176

Created 2003-08-20 by Tobin Fricke. Send corrections to <tobin@splorg.org>.